欧美色欧美亚洲另类七区,惠美惠精品网,五月婷婷一区,国产亚洲午夜

課程目錄:SAP PM Fundamentals to Advanced培訓(xùn)
4401 人關(guān)注
(78637/99817)
課程大綱:

         SAP PM Fundamentals to Advanced培訓(xùn)

 

 

Introduction

Installing and Configuring SAP Plant Maintenance (SAP PM)

System Requirements for Setting Up SAP PM
Overview of SAP PM Features and Architecture

The Plant Maintenance Functions
What are Technical Objects?
Preventive and Breakdown Maintenance
Levels of Maintenance Processes
Managing Maintenance Projects
The Plant Maintenance Information System
Overview of Supplementary SAP PM Functions

Utilizing and Enhancing SAP PM Side Panels

Working with Preconfigured Collaborative Human Interface Parts (CHIPS)
Accessing and Configuring other CHIPS
Creating a SAP PM Factory Calendar and Assigning Roles

How Do Different Plant Maintenance Units Interact?
Defining Technical Objects Using SAP PM

Incorporating the Organizational Structure
The Maintenance Planning Plant
Functions of Technical Objects
Warranties and Permits for Technical Objects
Overview of SAP PM Bills of Material and Serial Numbers

Installing Equipment and Defining Equipment Master Record

Choosing a Functional Location for an Equipment
Labeling of Functional Locations
Creating and Configuring SAP PM Work Center

Overview of SAP PM Maintenance Processes

The Breakdown Maintenance Process
The Corrective Maintenance Process
Inspecting the Technical System Using SAP PM

Planning and Executing the Appropriate Maintenance Process
Managing Maintenance Requests with SAP PM

Generating General and Breakdown Notifications
Planning and Scheduling a Maintenance Order
Administering Work Clearance
Withdrawing Materials for Maintenance Tasks
Confirming the Completion of Maintenance Requests
Overview of Mobile and Workflow Scenarios in SAP PM

Procuring External Services
Performing SAP PM Refurbishing Processes

Managing Repair Orders
Overview of SAP PM Preventive Maintenance

The Preventive Maintenance Task List
Implementing the Preventive Maintenance Process
Reporting Maintenance Planning and Other SAP PM Operations

Document Level v.s. Logistics Information System
Transferring SAP PM Data from Reported Entries

The Cross-Application Time Sheet (CATS)
Integrating SAP PM with Other SAP ERP Central Components

Troubleshooting

Summary and Conclusion

主站蜘蛛池模板: 密山市| 清涧县| 汝南县| 江阴市| 托克逊县| 江陵县| 平乐县| 阳朔县| 宁南县| 金平| 印江| 巴塘县| 福安市| 博野县| 石楼县| 镇坪县| 安义县| 贵南县| 连南| 肥城市| 湘潭市| 安陆市| 施甸县| 化州市| 九龙坡区| 文安县| 自治县| 南溪县| 吉林省| 南和县| 巴林左旗| 宁乡县| 正宁县| 望城县| 隆林| 宁陕县| 博湖县| 怀柔区| 阜南县| 措勤县| 巴南区|